Concrete Contractors of McKinney Logo

Concrete Contractors of McKinney

Parking Lot Striping that Holds the Line

Thermoplastic, epoxy, and traffic paint striping completed after hours so your lot opens bright and compliant.

Schedule Striping CrewAverage response: under 30 minutes

McKinney Project Execution

Refresh traffic markings, add ADA stalls, and keep fire lanes visible with striping crews who work on your schedule.

  • Layout redesign and restriping
  • Wheel stops, bollards, and signage installation
  • Speed bump installation and repainting
  • Thermoplastic crosswalks and legends

North Dallas Ready

Serving developers, GCs, property managers, and ownership groups across McKinney, Allen, Anna, Blue Ridge, Carrollton, Celina, Copeville, Dallas, Fairview, Farmersville, Frisco, Garland, Josephine, Lavon, Lewisville, Little Elm, Lowry Crossing, Lucas, Melissa, Murphy, Nevada, Parker, Plano, Princeton, Prosper, Richardson, Rockwall, Rowlett, Sachse, The Colony, Van Alstyne, Weston, Westminster, Wylie.

OSHA-10/30 certified crews with local jobsite experience
Daily QC, photo logs, and schedule updates delivered to GCs
Transparent billing, lien releases, and closeout packages
Trusted by Collin County ownership groups and facility directors

Parking lot striping across McKinney's commercial properties establishes traffic patterns, defines parking stalls, and ensures ADA compliance. From initial striping on new construction to re-striping existing lots, these pavement markings guide vehicles and communicate parking regulations.

ADA requirements mandate specific striping patterns for accessible parking, van-accessible spaces, and access aisles. We coordinate striping layouts with building officials ensuring commercial properties meet current accessibility standards.

Thermoplastic striping materials provide enhanced durability in high-traffic areas, while standard paint serves lighter-duty applications cost-effectively. Material selection depends on traffic volumes, budget considerations, and expected service life.

Why Choose Us

  • ADA compliance expertise with accessible parking requirements
  • Thermoplastic and paint options matched to traffic and budget
  • Layout optimization for parking capacity and circulation
  • Coordination with property management on access during installation
  • Rapid installation minimizing property disruption

Capabilities

What’s Included

Code Compliance

Layouts meet ADA, fire code, and municipal requirements.

Night Work

Lots remain open thanks to overnight striping and fast-drying materials.

Brand Alignment

Custom stencils, colors, and wayfinding support your tenant mix.

Thermoplastic, epoxy, and traffic paint applications

ADA parking upgrades, ramps, and signage

Fire lanes, crosswalks, and branded wayfinding

Industries

Who We Support

  • Retail & restaurant
  • Multifamily & HOA
  • Industrial
  • Healthcare
  • Education

Deliverables

What You Receive

  • Striping plan with ADA layout
  • Material data and dry time schedule
  • Before/after photo documentation
  • Maintenance plan and touch-up schedule

Process

How We Execute

Step 1

Scope Alignment

Review drawings, soils, and project goals to align budget and schedule.

Step 2

Preconstruction

Finalize submittals, permits, and mobilization logistics.

Step 3

Execution

Superintendents manage crews, QA, and inspections to hit milestones.

Step 4

Closeout

Punch list, documentation, warranties, and turnover ensure a clean finish.

FAQ

Common Questions

When should parking lots be restriped?

Parking lots should be restriped when markings fade to the point where stall boundaries and traffic patterns become unclear. Typical restriping intervals range from 2-5 years depending on traffic and material type.

What's the difference between paint and thermoplastic striping?

Paint striping costs less initially but requires more frequent renewal. Thermoplastic lasts 5-8 years vs. 2-3 years for paint, making it cost-effective for high-traffic areas despite higher initial cost.

What are ADA requirements for accessible parking?

ADA requires specific percentages of accessible spaces with defined dimensions, access aisles, and signage. Van-accessible spaces require 11-foot access aisles. We coordinate layouts meeting current requirements.

Can striping be done while our business is open?

Yes. Striping work can be phased to maintain parking capacity, with sections closed briefly during installation. Night work is available when daytime disruption is unacceptable.

How long before striped areas can be used?

Paint striping dries within 30-60 minutes under good conditions. Thermoplastic cools and hardens within minutes after application.

What's Included

Service Inclusions

Layout design and ADA compliance review

Surface cleaning and preparation

Stall striping and dimensional layout

Directional arrows and stop bars

Accessible parking symbols and signage

Loading zone and fire lane markings

Curb painting and wheel stops

Traffic control during installation

Representative example of project scope we handle

Shopping Center Restriping

Location

Allen TX Retail Center

Scope

Complete restriping of 425-stall parking lot with ADA upgrades

Client Situation

Property owner needed striping refresh and ADA compliance improvements before holiday shopping season

Our Approach

Developed phased approach maintaining customer parking, installed thermoplastic markings in high-traffic areas, upgraded accessible parking to current ADA standards

Outcome

All striping completed before target date, improving property appearance and accessibility compliance

Contact us to discuss your parking lot striping needs

Striping Programs

Need your lot restriped?

Send us a site plan or stall count—our striping team will respond with pricing and scheduling windows.

Call NowGet a Quote
Parking Lot Striping in McKinney TX | Concrete Contractors of McKinney